Describe the job. Get it measured, trade by trade.

Brief it like you'd brief a surveyor. Get it measured, priced from what you actually pay, and quoted.

Free to use, right now. No card, ever.

Foundation
3 lines measured
  1. 1Trench excavation for strip footing14 m
  2. 2215mm blockwork, cavity outer leaf42 reasonably sure
  3. 3150mm hardcore hardstanding18 Needs your eye
Flagged for you1
Everything else is ready to price.
WorkMoney out

One flagged line. The rest is measured.

From the plan on your phone to the merchant's sheet.

One rear extension, at every stage.

  1. 01

    Your drawing, or a few paragraphs

    Upload a plan, or just write it.

    A rear extension floor plan, dimensionedAn architectural plan of a 6 metre by 4 metre rear extension showing cavity wall construction, a set of patio doors, two windows, and dimension lines giving the overall width and depth. This is the kind of drawing Foundation reads to produce a measured take-off.ExistingKitchen / dining24.0 m²600040002000NRear extensionGround floor plan1:50 @ A3Rev B
  2. 02

    Measured, trade by trade

    Arithmetic shown, anything unsure flagged.

    3 lines measured
    1. 1Trench excavation for strip footing14 m
    2. 2215mm blockwork, cavity outer leaf42 reasonably sure
    3. 3150mm hardcore hardstanding18 Needs your eye
    Flagged for you1
    Everything else is ready to price.
  3. 03

    A take-off you can hand over

    Referenced, with assumptions and exclusions.

    v1 · 6 Aug 2026
    47
    Lines measured
    9
    Trades
    1
    Needs your eye
    1. GW-010Trench excavation for strip footing14 m
    2. GW-020Cart away arisings11 m³
    1. MA-010100mm solid concrete block, 7.5N96 m²
    2. MA-020215mm blockwork, cavity outer leaf42 m²
    3. MA-030Stainless wall ties, 4 per m²384 nrNeeds your eye
    Ready to price46
    Assumptions and exclusions carried through with it.
  4. 04

    Out to your merchants

    Split by trade. Chased if they go quiet.

    RFQ-2026-0043

    To your merchant. Masonry only, priced against your own refs.

    MA-010100mm solid concrete block, 7.5N96 m²
    MA-020215mm blockwork, cavity outer leaf42 m²
    MA-030Stainless wall ties, 4 per m²384 nr
    MA-040Sand and cement, mortar2.4 t

    Send the same sheet to three merchants and compare what comes back, line against line.

Describe the job. Get it measured.

  1. 01

    Write the brief

    A paragraph or two. Drawing optional.

  2. 02

    Measured, trade by trade

    A list per trade, anything unsure flagged.

  3. 03

    Answer what it flags

    Answer in your own words. That part re-measures.

Your prices. Never a guess.

  1. 01

    Your price list

    What your rep sent you.

  2. 02

    What you paid, or were quoted

    Past dockets, and every merchant sheet you have uploaded. Who quoted it, and when.

  3. 03

    Blank, if neither knows

    Type your own, or pick a merchant and ask. No made-up numbers.

  4. 04

    Their prices, back in

    Upload the sheet they send you. The job costs what it costs.

Foundation
4 lines
  1. 115mm copper tube (3m)€113.60Your price8 × €14.20
  2. 2Thermostatic shower valve€248.00You paid this1 × €248.00
  3. 3Close-coupled WC + cistern€196.50Chadwicks quoted 14 Mar1 × €196.50
  4. 4600mm vanity unitNo price yetyours to fill in, or ask a merchant
  5. 5Labour (4 days)€1,280.004 × €320.00 a day
Quote total€1,838.10
€558.10 materials + €1,280.00 labour, ex VAT
WorkMoney out

Every line says where its price came from.

A price in under two minutes, in the van.

Search ranked by what you buy most.

Saved assemblies

A job you do often, in one tap.

  • Bathroom first fixone tap
  • Consumer unit swapone tap
  • Boiler changeoverone tap

Send it, get the yes, get paid.

The quote is the hard part. The rest is one tap.

  1. 01

    Send it on WhatsApp

    Or email. A proper PDF, your logo.

  2. 02

    They accept on the link

    No account, no app.

  3. 03

    One tap to invoice

    Every line carried through.

  4. 04

    It chases for you

    From your own inbox, until they pay.

What you priced, against what it really cost.

The receipt against the job, line by line.

€1,043.60
€1,099.15
+€55.55
€1,204.85

What it does, in plain terms.

What is a construction take-off?

A take-off is the list of everything a job needs, measured out of the drawings or the specification: so many square metres of blockwork, so many metres of trench, so many wall ties. It is what you price a job from, and it is the part that takes an evening by hand.

Can Foundation read a drawing?

Yes. Attach a plan or a photo of one, tell us the scale, and confirm a dimension or two you have read off it yourself. Anything measured off the drawing is marked so you can check those lines first. If there is no scale on it, we say what we cannot determine rather than guessing.

Is this a bill of quantities?

It is a builder’s take-off rather than a formal bill of quantities. It follows the same conventions, grouped by trade with quantities, units and the arithmetic shown, and it carries its assumptions and exclusions with it. What it is not is a measured survey, and it says so on every copy.

Where do the prices come from?

Your own price list first, then your own history: what you paid on past dockets, and what a merchant quoted you on an earlier job, with their name and the date on it. If neither knows, the line stays blank and you either type a price or pick a merchant to ask. We never put a public estimate on a line, and the model is never asked for a price.

Does it send requests to builders providers?

Yes. Split the measured job across the merchants who cover each trade, or send the lot to one. They get a sheet with your quantities, your refs and blank rate columns, and Foundation chases whoever has gone quiet. Their prices come back to your own inbox, and you carry them into the quote.

What does Foundation cost?

Nothing at the moment. It is free to use and there is no card to add.